Notices, Polls and Petitions

  • TTC Subway Closure - St George to St Andrew

    TTC Subway Closure – St George to St Andrew – March 15-24The TTC is continuing to capitalize on reduced ridership during the COVID-19 pandemic and identifying opportunities to carry out vital state-of-good-repair work with minimal inconvenience to customers. There will be no subway service on Line 1 between St George and St Andrew stations for ten days from Monday, March 15 to Wednesday, March 24, 2021. Regular subway service will resume at approximately 6 AM on Thursday, March 25, 2021....
    Learn More >
  • Road Resurfacing - Dovercourt Road

    Road Resurfacing on Dovercourt Road from Sudbury St to Queen St WThe City of Toronto will be conducting road resurfacing on Dovercourt Road from Sudbury Street to Queen Street West from March 22 until June 1. Road users should expect delays and increased traffic on nearby main and side streets. The Field ambassador is Suresh Pillai, who can be reached at 647-968-8601 or [email protected]  
    Learn More >
  • Lansdowne Station Entrance Closure

    Lansdowne Station – Entrance Closure for Accessibility WorkThe main entrance to Lansdowne station will be closed until May, as the TTC is installing elevators to make Lansdowne Station accessible. The station will also be getting additional enhancements, including a new canopy for the main entrance.
    Learn More >
  • TTC Construction - Dovercourt and Queen

    TTC Construction – Dovercourt and QueenTTC will be rebuilding an existing underground utility chamber and duct bank on the east side of Dovercourt Road just north of Queen Street West. The utility chamber is located at the north-east corner of the Queen/Dovercourt intersection, and the duct bank runs along the east curb lane and connects to a utility chamber in front of 127 Dovercourt Road (which was rebuilt in 2019). The chamber is part of a network in the city...
    Learn More >
  • Metrolinx Caisson Drilling

    Metrolinx Caisson DrillingMetrolinx is conducting caisson drilling over the next five months. This involves boring (or drilling) a hole into the ground down to more supportive bedrock, lifting in steel reinforcements (or rebar cage), and then pouring concrete. This creates reinforced concrete columns underground that will form structural piers to support the load of the elevated guideway structure above.  The work is scheduled to take place during the day and overnight from February to July 2021. While most of this...
    Learn More >
  • Overnight Watermain work on Dufferin St: August 29th -August 31st

    City of Toronto will be conducting overnight work from August 29, 2018 to Aug 31, 2018 as part of the Dufferin St Watermain Relining and Cleaning Project. Overnight work will be required on two nights, but a watershut off is only required on the first night. The water will be off Wednesday, August 29 from 11 p.m. until 5 a.m. For more information please see the complete notice below or contact the Field Ambassador at 647-923-3430 or at [email protected]  ...
    Learn More >
  • TTC Undertaking Track and Intersection Renewal at Dundas St W and Lansdowne

    Learn More >

City Hall Address:

Toronto City Hall
100 Queen Street West, Suite C42
Toronto, ON M5H 2N2

Open: Monday - Friday 8:30AM - 4:30PM

Email: [email protected]

Phone: 416-392-7012

Fax: 416-392-7957

Constituency Office:

1240 Bloor Street West
Toronto, ON M6H 1N5

Open: Wednesday, Thursday and Friday
1pm - 6pm

eNewsletter
Stay up-to-date with Ana Bailão!

© 2021 ANABAILAO.COM. ALL RIGHTS RESERVED.